旧里番空之色水之色在线,欧美日韩亚洲国产综合在线,中国vitafusion孕妇,国产精品亚洲片在线不卡

查看全部
當(dāng)前位置:首頁   >    產(chǎn)品中心   >    電壓擊穿試驗(yàn)儀   >    介電擊穿強(qiáng)度試驗(yàn)儀   >   BDJC-50KV絕緣高電壓擊穿試驗(yàn)儀 產(chǎn)品展示

絕緣高電壓擊穿試驗(yàn)儀

型 號(hào)BDJC-50KV

更新時(shí)間2025-07-16

廠商性質(zhì)生產(chǎn)廠家

報(bào)價(jià)

產(chǎn)品描述:絕緣高電壓擊穿試驗(yàn)儀

產(chǎn)品概述

絕緣電壓擊穿試驗(yàn)儀產(chǎn)品特點(diǎn)

1、運(yùn)行于WIN  XP/WIN7/WIN8系統(tǒng)下的獨(dú)立安裝軟件,界面友好,操作簡(jiǎn)單    2、實(shí)驗(yàn)顯示曲線,數(shù)據(jù)自動(dòng)儲(chǔ)存,自動(dòng)查找  3、多種用途可以進(jìn)行交、直流試驗(yàn)試驗(yàn)準(zhǔn)確、可靠、安全   4、計(jì)算機(jī)控制試驗(yàn)過程,自動(dòng)判斷停止,自動(dòng)復(fù)位   5、超壓、過流、短路、漏電、誤操作等多種保護(hù)

 

 

絕緣電壓擊穿試驗(yàn)儀軟件功能:

  01、軟件平臺(tái):WINDOWS窗口操作平臺(tái),界面直觀,便于操作、  02、曲線顯示:在實(shí)驗(yàn)過程中可以動(dòng)態(tài)顯示試驗(yàn)曲線   03、數(shù)據(jù)導(dǎo)出:可以對(duì)試驗(yàn)結(jié)果導(dǎo)入EXCEL表格  04、實(shí)驗(yàn)報(bào)告:可以人為設(shè)置報(bào)告名稱,并對(duì)實(shí)驗(yàn)報(bào)告進(jìn)行打印   05、試驗(yàn)方式:可以根據(jù)需求對(duì)直流試驗(yàn)和交流試驗(yàn)進(jìn)行靈活選擇   06、試驗(yàn)方法:可以根據(jù)需求自行選擇擊穿電壓、耐壓試驗(yàn)、梯度試驗(yàn)   07、參數(shù)設(shè)置:可以根據(jù)不同的試驗(yàn)方式及試驗(yàn)方法靈活設(shè)置所需的不同參數(shù)值  08、試樣設(shè)置:可對(duì)不同標(biāo)準(zhǔn)的試樣參數(shù)靈活設(shè)置   09、人員管理:設(shè)置用戶名及密碼,不同的操作員登入進(jìn)行不同的試驗(yàn),互不影響  10、標(biāo)準(zhǔn)選擇:含有不同標(biāo)準(zhǔn),可根據(jù)需求自行選擇

11、連續(xù)操作:連續(xù)操作試驗(yàn)時(shí),可直接在軟件里選擇電機(jī)復(fù)位,進(jìn)行二次試驗(yàn)

 

 

絕緣電壓擊穿試驗(yàn)儀技術(shù)指標(biāo):

01、輸入電壓: 交流 220 V 02、輸出電壓: 交流 0--100 KV ;  直流 0—100 KV

03、電器容量: 10KVA   04、高壓分級(jí): 0-100KV   05、升壓速率:0.01-5.0kv

 

 

 

絕緣電壓擊穿試驗(yàn)儀整機(jī)組成:

1、升壓部件:由調(diào)壓器和高壓變壓器組成0~50KV的升壓部分。 2、動(dòng)部件:由步進(jìn)電機(jī)均勻調(diào)節(jié)調(diào)壓器使加給高壓變壓器的電壓變化。 3、檢測(cè)部件:由集成電路組成的測(cè)量電路。通過信號(hào)線把檢測(cè)的模擬信號(hào)和開關(guān)信號(hào)傳給計(jì)算機(jī)。 4、計(jì)算機(jī)軟件:通過智能電路把由檢測(cè)設(shè)備采集的測(cè)控信號(hào)傳給計(jì)算機(jī)。計(jì)算機(jī)根據(jù)采集的信息控制設(shè)備運(yùn)行并處理試驗(yàn)結(jié)果。  5、試驗(yàn)電極:根據(jù)國(guó)家標(biāo)準(zhǔn)(1408.1-2006)隨設(shè)備提供三個(gè)電極,具體規(guī)格為:Ф25mm×25mm兩個(gè);Ф75mm×25mm一個(gè)。

 

 

絕緣電壓擊穿試驗(yàn)儀注意事項(xiàng):
1、介電擊穿強(qiáng)度試驗(yàn)儀安裝時(shí)應(yīng)具有獨(dú)立的接地線。
2、在開機(jī)前,操作者要首先熟悉操作方法。
3、儀器不能在有強(qiáng)烈腐蝕性氣體及有顆粒雜質(zhì)的氣體環(huán)境中使用。
4、試驗(yàn)環(huán)境溫度15度到25度之間,相對(duì)濕度60%到70%之間
5、試樣擊穿瞬間有火花產(chǎn)生并伴有聲響,屬正常現(xiàn)象。
6、每次更換試樣或接觸高壓電極時(shí)必須用高壓放電棒對(duì)高壓電極進(jìn)行放電,放電時(shí)間5秒以上。

7、每次進(jìn)行試驗(yàn)前,必須檢查儀器接地。

 

 

試驗(yàn)方式:直流/交流:擊穿試驗(yàn)、耐壓試驗(yàn)、階梯試驗(yàn)

顯示方式:曲線/數(shù)據(jù)顯示,數(shù)據(jù)打印。

試驗(yàn)空間:絕緣油/空氣

升壓速率:0.1KV/S-3KV/S

整機(jī)精度:≤2% 

關(guān)于擊穿電壓測(cè)試術(shù)語、定義及類型:

1、耐電壓值: 將電壓升高到規(guī)定值,保持一定時(shí)間試樣未被擊穿,稱此電壓值為試樣的耐電壓值;2、擊穿電壓: 試樣在某一電壓作用下被擊穿,此時(shí)的電壓值稱擊穿電壓;3、擊穿電壓強(qiáng)度: 試樣的擊穿電壓與其厚度之比,稱電壓強(qiáng)度,以KV/mm表示。

絕緣電壓擊穿試驗(yàn)儀適用材料:

    主要適用于固體絕緣材料如:電線套管、樹脂和膠、浸漬纖維制品、云母及其制品、塑料薄膜、陶瓷、玻璃、絕緣漆、硫化橡膠、電纜紙、絕緣漆漆膜、硬質(zhì)橡膠、紙板等絕緣介質(zhì)在空氣或液體介質(zhì)中,測(cè)量工頻(48~62Hz)或?qū)?yīng)直流電壓下?lián)舸?qiáng)度和耐電壓時(shí)間。適用于連續(xù)均勻升壓或逐級(jí)升壓的方式,對(duì)試樣施加交流/或直流,電壓直至擊穿,測(cè)量擊穿電壓值,計(jì)算試樣的擊穿強(qiáng)度;用迅速升壓的方法,將電壓升到規(guī)定值,保持一定的時(shí)間試樣不擊穿,定此時(shí)規(guī)定值為試樣的耐電壓值。

 

 

絕緣電壓擊穿試驗(yàn)儀注意事項(xiàng):

1、試驗(yàn)過程中不能讓無關(guān)人員靠近,因本試驗(yàn)儀器可產(chǎn)生較高的電壓,未經(jīng)過培訓(xùn)的人員不能使用該設(shè)備。試驗(yàn)時(shí)要有監(jiān)護(hù)人員,不要單人使用。以防萬一發(fā)生意外情況。

2、長(zhǎng)時(shí)間不使用設(shè)備,在再使用時(shí),先讓儀器空載加壓一次,即把高壓電極的接線從均壓球上取下。查看計(jì)算機(jī)試驗(yàn)界面,看看高壓電壓是否正常。

3、試驗(yàn)中發(fā)生意外情況要及時(shí)切斷電源,問題處理后才能繼續(xù)試驗(yàn)。

4、設(shè)備安放要平穩(wěn),安放的地面要堅(jiān)固。是水泥地面以免產(chǎn)生共振。

5、該設(shè)備在使用中外殼要接保護(hù)地線,既設(shè)備外殼接大地,以保護(hù)操作人員和設(shè)備運(yùn)行的安全。

6、使用完設(shè)備后,要關(guān)掉系統(tǒng)各部分電源,不準(zhǔn)帶電插拔電源線。

7、要按規(guī)定的電源電壓接入設(shè)備。確保電路接線正確。否則會(huì)損壞設(shè)備。

8、該儀器需安置在室內(nèi),實(shí)驗(yàn)室應(yīng)整潔、干燥、無腐蝕性介質(zhì),非相關(guān)人員不要隨意操作。

9、不要讓設(shè)備電纜碰到尖邊,以免劃破電纜絕緣;不要讓電纜壓在重物之下,以免壓斷電纜引起火災(zāi);不要用電纜拉物體或用電纜捆綁物體,以免拉斷電纜使設(shè)備不能正常運(yùn)轉(zhuǎn)。

10、不要讓設(shè)備碰到水濺,腐蝕性氣體,可燃?xì)怏w和可燃物。如果不避免,可能火災(zāi)。

11、搬動(dòng)設(shè)備時(shí),要切斷設(shè)備電源,既要把插頭從插座中拔下。禁止搬動(dòng)設(shè)備時(shí)放倒設(shè)備或傾斜45°角以上。

12、不要在設(shè)備運(yùn)行時(shí)插拔設(shè)備的電源插頭。

13、儀器安裝時(shí)應(yīng)具有獨(dú)立的接地線。

14、在開機(jī)前,操作者要首先熟悉操作方法。

15、儀器不能在有強(qiáng)烈腐蝕性氣體及有顆粒雜質(zhì)的氣體環(huán)境中使用。

16、試驗(yàn)環(huán)境溫度15度到25度之間,相對(duì)濕度60%到70%之間。

17、試樣擊穿瞬間有火花產(chǎn)生并伴有聲響,屬正?,F(xiàn)象。

18、每次更換試樣或接觸高壓電極時(shí)必須用高壓放電棒對(duì)高壓電極進(jìn)行放電,放電時(shí)間5秒以上。

19、每次進(jìn)行試驗(yàn)前,必須檢查儀器接地

 

 

 

 

Insulation breakdown voltage tester product features 
 
1, run on Windows XP/Windows 7 / doing under the system of independent software installation, friendly interface, simple operation, experiment 2 showed curve, data storage automatically, can automatically find 3, a variety of utility ac and dc test experiment was carried out accurate and reliable, safe and 4, the computer control experiment process, automatic stop, automatic reset 5, overpressure, over current, short circuit, leakage, wrong operation and so on the many kinds of protection 
 
 
 
 
 
Insulation breakdown voltage tester software functions: 
 
01, software platform: WINDOWS operating platform, intuitive interface, easy to operate, 02, curve display: in the process of experiment can dynamically display test curve 03, data export: can be on the test results into EXCEL spreadsheet 04, experiment report, report the name can be set, and the experiment report print 05, test method: dc test and ac test according to the requirements for flexible choice of 06, test method, can according to demand to choose the breakdown voltage, compression test, the gradient test 07, parameter Settings: can according to the different test method and test method for flexible Settings required for different parameter value of the euro, sample setting: can be set up for different standard sample parameters of flexible 09, personnel management: set the user name and password, different operator login in different experiments, each other 10, selection criteria: contain different standards, can choose according to the demand 
 
11, continuous operation, continuous operation test, can choose motor directly in the software reset, for a second test 
 
 
 
 
 
Insulation breakdown voltage tester technical indicators: 
 
02:01, input voltage ac 220 V, output voltage: communication 0-100 KV; Dc 0-100 KV 
 
03, electric capacity: 10 kva 04, high-pressure sizing: 0-100 kv 05, pressure rise rate: 0.01 to 5.0 kv 
 
 
 
 
 
 
 
Insulation breakdown voltage tester of the machine: 
 
1, booster parts: consists of a voltage regulator and the high voltage transformer 0 ~ 50 kv booster section. 2, moving parts: uniform regulation voltage regulator by stepper motor to high voltage transformer voltage change. 3, test parts: measurement circuit composed of integrated circuit. Through the analog signal and the detection line switch signal to the computer. 4, computer software, by testing equipment acquisition through inligent circuit of measurement and control signals to the computer. Computer control equipment operation according to the collected information and process the test results. 5, test electrode: according to the national standard (1408.1-2006) with the equipment to provide three electrodes, specifications are: Ф two 25 mm x 25 mm; Ф a 75 mm x 25 mm. 
 
 
 
 
 
Insulation breakdown voltage tester to note: 
1, dielectric breakdown strength tester when installation should be independent grounding line. 
2, in front of the boot, the operator should be familiar with the operation method in the first place. 
3, instrument cannot be in a strong corrosive gas and particle impurity gas environment. 
4, test environment temperature between 15 to 25 degrees, relative humidity between 60% and 70% 
5, sample spark breakdown moment accompanied by sound, belongs to the normal phenomenon. 
6, each replacement sample or contact electrodes must be used when high pressure discharge rod for high voltage electrode discharge, discharge time more than 5 seconds. 
 
7, before each test, must check instrument grounding. 
 
 
 
 
 
Test method: dc/ac: breakdown test, compression test, step test 
 
Display mode: curve/data display, data printing. 
 
Test space: insulating oil/air 
 
Pressure rise rate: 0.1 KV/S - 3 KV/S 
 
High precision: 2% or less 
 
About the breakdown voltage test terms, definitions, and type: 
 
1, resistance to voltage value: will the voltage to the specified value, breakdown, keep a certain time sample is not according to the voltage value of withstand voltage value of the sample; 2, breakdown voltage, specimen under a certain voltage is punctured, at this time of the voltage value according to the breakdown voltage; 3, breakdown voltage intensity: the thickness of the sample breakdown voltage and its ratio, according to the voltage, expressed as a KV/mm. 
 
Insulation breakdown voltage tester applicable materials: 
 
Is mainly suitable for solid insulating material such as wire casing, resin and rubber, impregnated fiber products, mica and its products, plastic, ceramic, glass, insulating paint, rubber, cable paper, insulating paint film, hard rubber, cardboard in air or fluid medium, such as insulating medium measuring power frequency (48 ~ 62 hz) or the corresponding breakdown strength under dc voltage and voltage withstand time. Apply continuous uniform booster or booster way, step by step toward a sample dc, ac/or until the breakdown voltage, breakdown voltage measurement, calculation of sample breakdown strength; Use the method of rapid booster, e., will increase the voltage to maintain a certain amount of time the sample breakdown, not set the withstand voltage value of the specified value for sample and now. 
 
 
 
Insulation breakdown voltage tester to note: 
 
1, test process can't let irrelevant personnel near, because of this test instrument can produce high voltage, not trained personnel can not use the equipment. Test for care workers, not a single use. In case of one thousand something unexpected happens. 
 
2, do not use the equipment for a long time, when in use again, let the instrument light pressure, namely the high voltage electrode connection from the pressure on the ball. Check the computer test interface, see if high voltage is normal. 
 
Some accidents happen in 3 and test to cut off power supply in time, the problem can continue to test after processing. 
 
4, equipment put to smooth, lay the ground to strong. It is best to cement floor to avoid resonances. 
 
5, the equipment is in use shell to protect earthed, both equipment enclosure to the earth, in order to protect the operator and the safety of the equipment operation. 
 
6, after using the device, to switch off the system power supply, the parts are not allowed to be charged to plug the power cord. 
 
7, to the voltage of power supply in accordance with the provisions, access equipment. To ensure correct circuit connection. Otherwise it will damage to the equipment. 
 
8, the instrument should be placed in the interior, the laboratory should be clean, dry, no corrosive medium, the relevant personnel don't operate. 
 
9, don't let equipment cable against sharp edge, so as not to cut the cable insulation; Don't put the cable under the weight, in order to avoid pressure caused by the cable fire; Don't use cable to pull object or bundled with cable, so as not to snap cable equipment will not operate properly. 
 
10, don't let equipment encounter splash water, corrosive gas, flammable gas and combustible. If they don't avoid, fire. 
 
11, moving equipment, to cut off the power supply equipment, as well as the plug from the socket. Ban move down device or equipment at more than 45 ° Angle. 
 
12, do not plug equipment during operation of the power plug. 
 
13, instrument installation should be independent grounding line. 
 
14, in front of the boot, the operator should be familiar with the operation method in the first place. 
 
15, instrument cannot be in a strong corrosive gas, and to be used in particle impurity gas environment. 
 
16, test environment temperature between 15 to 25 degrees, relative humidity between 60% and 70%. 
 
17 spark breakdown moment, sample produce and accompanied by sound, belongs to the normal phenomenon. 
 
18, each replacement sample or contact electrodes must be used when high pressure discharge rod for high voltage electrode discharge, discharge time more than 5 seconds. 
 
19, before each test, must check instrument grounding 

 

 

留言框

  • 產(chǎn)品:

  • 您的單位:

  • 您的姓名:

  • 聯(lián)系電話:

  • 常用郵箱:

  • 省份:

  • 詳細(xì)地址:

  • 補(bǔ)充說明:

  • 驗(yàn)證碼:

    請(qǐng)輸入計(jì)算結(jié)果(填寫阿拉伯?dāng)?shù)字),如:三加四=7
聯(lián)系人:陳丹
手機(jī):
18911395947
點(diǎn)擊這里給我發(fā)消息
 
精品综合在线第一区亚洲| 国产成人精品男人女人高潮 | 久久久精品一区aaa片| 亚洲一区二区啊射精日韩| 亚洲综合无码精品一区二区三区| 老色鬼永久精品网站| 啊轻点灬太粗嗯太深了用力| 群体交乱之放荡娇妻| 久久久精品老熟女诱惑我| 午夜福利片手机在线播放| 再深点灬舒服灬太大了下载 | 亚洲图片欧美另类图片区| 中文字幕在线无码加勒比| 尤物视频在线观看网站入口| 久久精品国产亚洲av嫖农村妇女| 久久久精品456亚洲影院| 无码av天天av天天爽| 韩国免费a级作爱片无码| 久久综合亚洲鲁鲁九月天| 在免费jizzjizz在线播放| 欧美日韩韩高清在线不卡| 久久久久久久久久久大全| 亚洲精品AV一区午夜福利| 亚洲青草品无码专区网站| 妺妺窝人体色www在线下载| 日韩三级电影一区二区三区| 精品人妻人人爽av网址| 国产婷婷久久综合五月欲色| 欧美日韩成人综合天天影院| 欧美性野久久久久久久久| 久久热精品视频| 按摩高潮A片一区二区三区| 亚洲午夜精品久久久久久抢| 国产精品秘 a在线观看| 亚洲第一区中文99精品| 按摩师按的我下面有水流出来| 女同性黄网AAAAA片| 男人添女荫道口视频| 欧美 亚洲 超碰 在线| 五月婷婷2019在线观看| 色欲色香天天天综合无码|